QUOTATION OF FINISHING PART FOR CONSTRUCTION
Huynh Gia Viet Design – Construction Co., Ltd. provides complete construction services with standard Vietnamese procedures and quality.
Hotlines : 0944.432.466 – 0909.432.466.
HUYNH GIA VIET DESIGN –CONSTRUCTION CO.,LTD
- Address: 173/21 Tan Son Nhi Street, Tân Son Nhi Ward, Tan Phu District, HCMC
- Phone number : 0944.432.466 – 0909.432.466
- Email : huynhgiaviet.tkxd@gmail.com
- Wed : huynhgiaviet.vn
- Director : VÕ HUỲNH TUẤN ANH
PACKAGE PRICE APPLICATION:
- Normal package: 5.000.000/m2
- Standard package: 5.400.000/m2
- Premium package: 5.800.000/m2
( The above unit price applies to houses with total construction area> 300m2, and 1 facade, free of cost of architectural design. )
REMARKS:
- Applicable in normal construction sites and construction conditions.
- Excluding the cost of pile driving, soft soil treatment (if any).
- Excluding the cost of demolition, dismantling old structures (if any).
- Excluding the cost of transporting debris for investors who have special requirements on feng shui.
- Electricity and water sources (including costs) for construction are provided by the investor of the project.
- CALCULATION METHOD OF CONSTRUCTION SITE:
- Parts of foundation area: 30-40% (k=0.3-0.4)
- Parts of semi-basement area: 150%-170% (k=1.5-1.7)
- Basement area: 200% (k=2.0)
- Part of area (Ground floor, 1st floor, 2nd floor …): 100% (k=1.0)
- Parts of reinforced concrete roof area, areas without wall or roof: 50% (k=0.5)
- Parts of corrugated iron and roof area: 30% (k=0.3)
- The area of iron truss roof tile: 70% (k=0.7) (tính theo mặt nghiêng)
- Parts of reinforced concrete BTCT roof area: 100% (k=1.0) (calculated by slope)
- Parts of floor clearance> 12 m2 : 50% (k=0.5)
- Parts of floor clearance = <12 m2: 100% calculation (k = 1.0).
- Miscellaneous storey building, classical style: 110% (k = 1.1) (calculation is only applied to calculate construction costs, not applicable to design)
- COST OF CONSTRUCTION
- Construction cost = Construction unit price x Construction size x K-factor
- CONSTRUCTION WORK CONTENTS:
- Installation construction of worker camp.
- Location survey: position, foundation and elevation.
- Digging soil, pouring debris, constructing foundation and ground beam.
- Construction and installation of septic tanks and manholes.
- Construction of reinforced concrete columns-beams-floors
- Construction of stairs and steps with tiles.
- Internal and external wall construction.
- Installation of roofs and roofing tiles (if any)
- Installation of recessed wall electric -water system.
- Waterproofing of roof, terrace, toilet, balcony …
- Labor for lining bricks and walls.
- Labor for installing toilet wall tiles, kitchen.
- Labor for electrical equipment lighting installation.
- Labor for installing sanitary equipment.
- Labor for water painting.
- Security and cleaner of the project (excluding industrial hygiene).
- Handover the project.
We are confident to be your reliable partner.