QUOTATION OF FINISHING PART FOR CONSTRUCTION

Huynh Gia Viet Design – Construction Co., Ltd. provides complete  construction services with standard Vietnamese procedures  and quality.

Hotlines : 0944.432.466 – 0909.432.466.

HUYNH GIA VIET DESIGN –CONSTRUCTION CO.,LTD

  • Address: 173/21 Tan Son Nhi Street, Tân Son Nhi Ward, Tan Phu District, HCMC
  • Phone number   : 0944.432.466 – 0909.432.466
  • Email           : huynhgiaviet.tkxd@gmail.com
  • Wed             : huynhgiaviet.vn
  • Director   : VÕ HUỲNH TUẤN ANH

PACKAGE PRICE APPLICATION:

  • Normal package:        5.000.000/m2
  • Standard package:     5.400.000/m2
  • Premium package:     5.800.000/m2

( The above unit price applies to houses with total construction area> 300m2,  and 1 facade, free of cost of architectural design. )

REMARKS:

  • Applicable  in normal construction sites and  construction conditions.
  • Excluding the cost of pile driving, soft soil treatment (if any).
  • Excluding the cost of demolition, dismantling old structures (if any).
  • Excluding the cost of transporting debris for investors who have special requirements on feng shui.
  • Electricity and water sources (including costs) for construction are provided by the investor of the project.
  1. CALCULATION METHOD OF CONSTRUCTION SITE:
  • Parts of foundation area: 30-40% (k=0.3-0.4)
  • Parts of semi-basement area: 150%-170% (k=1.5-1.7)
  • Basement area: 200% (k=2.0)
  • Part of area (Ground floor, 1st floor, 2nd floor …): 100% (k=1.0)
  • Parts of reinforced concrete roof area, areas without wall or roof: 50% (k=0.5)
  • Parts of corrugated iron and roof area: 30% (k=0.3)
  • The area of ​​iron truss roof tile: 70% (k=0.7) (tính theo mặt nghiêng)
  • Parts of reinforced concrete BTCT roof area: 100% (k=1.0) (calculated by slope)
  • Parts of floor clearance> 12 m2 : 50% (k=0.5)
  • Parts of floor clearance = <12 m2: 100% calculation (k = 1.0).
  • Miscellaneous storey building, classical style: 110% (k = 1.1) (calculation is only applied to calculate construction costs, not applicable to design)
  1. COST OF CONSTRUCTION
  • Construction cost = Construction unit price x Construction size x K-factor
  1. CONSTRUCTION WORK CONTENTS:
  • Installation construction of worker camp.
  • Location survey: position, foundation and elevation.
  • Digging soil, pouring debris, constructing foundation and ground beam.
  • Construction and installation of septic tanks and manholes.
  • Construction of reinforced concrete columns-beams-floors
  • Construction of stairs and steps with tiles.
  • Internal and external wall construction.
  • Installation of roofs and roofing tiles (if any)
  • Installation of recessed wall electric -water system.
  • Waterproofing of roof, terrace, toilet, balcony …
  • Labor for lining bricks and walls.
  • Labor for installing toilet wall tiles, kitchen.
  • Labor for electrical equipment lighting installation.
  • Labor for installing sanitary equipment.
  • Labor for water painting.
  • Security and cleaner of the project (excluding industrial hygiene).
  • Handover the project.